Forum quick links
Regularly Occupied Space + Basement View Access
NC-2009 IEQc8.2:Daylight and views - viewsposted by Ryan Kurlbaum on
We are doing a zero-lot line project in NYC on a very narrow site.
Regularly occupied area included in 8.1 but excluded in 8.2
NC-2009 IEQc8.2:Daylight and views - viewsposted by Ashley Love on
I am working on credits 8.1 and 8.2 for a school (LEED 2009 Schools).
compliance for rentals spaces in LEED-NC
NC-2009 IEQc8.2:Daylight and views - viewsposted by MAUDE PINTAL on
I can not find any instruction for tenant space that are provided without any layout.
Moveable Walls for Views Calculations?
NC-2009 IEQc8.2:Daylight and views - viewsposted by Joanne Sawatzky on
Are moveable walls considered open or closed for Views calculations? I read furniture and partitions are not included: Does furniture need to be included in floor plan when completing views calcul
Views for Ballroom (Conference Center)
NC-2009 IEQc8.2:Daylight and views - viewsposted by Qiongwen Kong on
We have a project that consists of a 17-story and a large conference center on lower levers.
Varying sill heights
NC-2009 IEQc8.2:Daylight and views - viewsposted by Sara Sweeney on
I am working on a project - a preschool, and the architect has windows with varying sill heights.
sight line angle?
NC-2009 IEQc8.2:Daylight and views - viewsposted by Carrie Laurendine on
Hello, im documenting this credit for the firs time ever, and little confused over something.
IEQc8.2-EP
NC-2009 IEQc8.2:Daylight and views - viewsposted by Sigrid Charlotte Sturlason on
I am currently working on the exemplary performance views of IEQc8.2 and I thought for a second that I had succeeded in achieving 90% EP views for both Measure 3 and 4 and that I could exhale and m
3 glazed panels - LEEDv2009
NC-2009 IEQc8.2:Daylight and views - viewsposted by LEED Pro Consultant on
Hello, We have a layout configuration in which working spaces (offices) have glazed panels, allowing views to the exterior through other spaces that include also glazed panels.
Incomplete tenant space
NC-2009 IEQc8.2:Daylight and views - viewsposted by Therese Thompson on
We're working on a multi-family residential project that includes less than 10% of the gross floor area as leasable tenant space.