IEQ Credit 5 - Air Recirculation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  eric jendro  on 

I have school with a wood shop. There is a dust collector that exhausts saw dust from the equipment and recirculates the air back to the space after being filtered.

1
Thu Apr 26, 2012, 6:01 pm

exhaust from recycle storage room?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Carrie Laurendine  on 

does the room that contains recycle storage bins need to be exhausted to the exterior?

1
Mon Nov 11, 2013, 11:04 pm

Chemical/Hazardous Gas Area Separation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Jason Warner  on 

We have a project that has a garage which needs to have self-closing doors and deck to deck walls or hard lid to other areas.

0

Parking Garage Entrance

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Jill Edelman  on 

We are working on a 8 story + Basement Courthouse in Northern California. We have a private parking garage in the basement with 21 parking spots just for the Judges.

1
Mon Jun 15, 2015, 7:23 pm
1
Fri Jun 11, 2010, 7:11 pm

Electrostatic Filtration

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Keith Amann  on 

A project is considering using electrostatic filters in lieu of media-based filters (typically measured in MERV).

1
Fri Dec 9, 2011, 6:00 pm

Janitor Closets

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Charles Nepps  on 

Do all janitor closets on a project need to meet the requirements of the credit, or can you exempt some closets by having a policy of only storing cleaning supplies in certain designated rooms?

1
Fri Aug 21, 2015, 9:49 pm

Robotic Parking Garage Ventilation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Gabriela Mena   on 

Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf

1
Wed Apr 19, 2017, 2:10 pm

MERV Filter during and after Test run

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Yong Lee Low  on 

Regarding the MERV filter, I had advised the M&E the LEED Requirements and he has replied as "During the test run period (80days), the MERV 8 will be installed on the AHU, PAH & VRF Indoor

1
Thu Mar 3, 2011, 2:34 pm

Access Panel in Hard Lid Ceiling

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ralph Bicknese  on 

Our janitor rooms do not have deck-to deck partitions.

1
Fri Feb 22, 2013, 2:52 pm