Post a question or comment
Credit Filters
Indoor Chemical and Pollutant Source Control
Filter by location
Forum
Topic
Replies
Recent

Small Laundry Rooms and Exhaust

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Adam West  on 

Has anyone not exhausted a small laundry room in a commercial building and had this strategy approved through a review?

6
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Aug 20, 2013, 3:43 pm

Full extent of documenting hazardous chemicals and gases

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sean Hogan  on 

Hi, I have project seeking certification that has cooking demonstration rooms, flavours laboratory and a staff cafeteria.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jul 15, 2013, 5:22 pm

Walk-off mats within a vestibule

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Colin Day  on 

Would walk off mats under 10 feet in length be sufficient to meet the credit requirements if they are located within a vestibule? Thanks for your help...

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jul 15, 2013, 4:40 pm

Entryway systems from undercover parking

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ricardo Sá  on 

I'm working on a project that will have an entrance from an undercover parking below the building.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jun 25, 2013, 3:27 pm

Recycling Rooms

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Saju Varghese  on 

Should recycling rooms be included in this credit?

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Wed Jun 19, 2013, 11:11 pm

PTAC MERV 13

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Erika Duran  on 

Based on the July 2010 addendum, MERV 13 Filters are only based on Outdoor air stream.

5
Mon Jun 3, 2013, 7:37 pm

Walk off mats required at terrace entrances?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Carly Ruggieri  on 

One of my residential projects will have terraces on a few floors that are accessible to occupants (part of the amenity spaces).

3
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu May 30, 2013, 8:00 pm

Historic Building Limitations

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Todd Bundren  on 

Has anyone been successful with a variance on the 10'-0" walk off-matt rule based on the limitations of a historic building? My building has an 8'-0" vestibule at the 2 main entrances.

3
Associate Principal - Director of Sustainabilty
Lawrence Group
LEEDuser Premium Member
10 thumbs up
Thu May 30, 2013, 7:58 pm

Sharing "designated" exhaust systems

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Iris Amdur  on 

Can a project provide one shared exhaust system for two hazardous gas/chemical use areas? Or to comply with the term "designated" does each space needs its own exhaust system?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 4, 2013, 12:00 am

Alternative walk-off mat materials

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Tiffany Moore  on 

I've been asked to evaluate a recycled rubber entry system under the "carpet tile" concept.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 20, 2013, 7:38 pm