Construction IAQ management plan - before occupancy
Filter by location
Forum
Topic
Replies
Recent

Permanent furniture

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Pascal Genest-Richard  on 

We would like to know if it is possible to start the flush out (and maybe even finish it) before all permanent furniture is installed.

1
Sat Jul 26, 2014, 12:32 pm

Testing with multiple systems in one space

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Nate Steeber  on 

I've looked deeply into all the comments here, but I can't seem to find an answer - I apologize if this is a repeat, or too simple of a question: My project has many AHUs, in some cases two differ

1
Thu Oct 8, 2015, 8:40 pm

Option 2 Meaning of "Contiguous Area"

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Daniel Smith  on 

Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe

1
Mon Oct 31, 2016, 2:10 pm

IAQ Management Plan

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Maura Adams  on 

We used an EQc3.1 plan and used the testing method to meet EQc3.2 requirements.

1
Thu Jan 5, 2012, 9:14 pm

Testing sampling location for independent ventilation system

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Lilian Seow  on 

Each of the 400+ residential suites is designed with an independent stand-alone ventilation system. According to the air testing requirement in pp.

1
Sat Oct 12, 2013, 5:51 am
1
Mon May 17, 2010, 2:56 am

punch list for air testing option?

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Carrie Laurendine  on 

the LEED reference manual states that punch list must be completed prior to flush out. However, it doesn't state either way if punch list must be completed prior to air testing.

1
Sat Nov 16, 2013, 1:27 am

Testing for Residential

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Donald Green  on 

I have read the threads for this credit as well as any LI that I could find to determine the amount of testing locations required.

1
Thu Aug 7, 2014, 2:48 pm

Definition of Occupancy

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Nilo Regojo  on 

I'm having trouble finding a dfinition for "Occupancy" We want to pursue IEQc3.2 using Option 1,Path 2 for a movie theater.

1
Fri Jun 3, 2011, 2:41 pm

Continuous flush out?

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Erin Holdenried  on 

For Option 1 Path 2, can there be a time gap between when the pre occupancy ends and post-occupancy flush out begins? Or does one have to immediately follow the other?

1
Thu Nov 29, 2012, 4:10 pm