Post a question or comment
Credit Filters
Minimum IAQ Performance
Filter by location
Forum
Topic
Replies
Recent

VRP Compliance Calculator in Appendix

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Lawrence Lile  on 

I am trying to understand the VRP Compliance Calculator at the end of the template. I have completed the 62MZCalc spreadsheet, and it comes up with one answer for 30% increased ventilation.

4
Tue Sep 16, 2014, 10:33 am

warehouse and storage room difference - table 6-1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

What is the difference between storage room and warehouse in table 6-1 of ASHRAE 62.1-2007? Storage rooms need twice the ventilation required for warehouses.

5
Thu Sep 11, 2014, 5:45 am

100% OA multiple-zone system

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Michael Wironen  on 

Hi, I'm a little confused about a review comment we received. We have rooftop AHUs supplying 100% Outdoor Air to multiple zones equipped with terminal fan coil units.

2
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Thu Sep 4, 2014, 2:19 pm

Bathrooms and Storage rooms

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Nelina Loiselle  on 

According to the IEQ space matrix bathrooms and storage rooms are excluded from VRP calculations for IEQp1, would they still be excluded from 100% OA systems?

4
Fri Aug 8, 2014, 1:49 pm

IEQp1-A1 Statement "Would need over 100% OA Intake"

NC-2009 IEQp1:Minimum IAQ Performance
posted by  James Doyle  on 

Our project credit data has to be completed by 8-5 and I am getting a message "Would need over 100% OA Intake" at the end of the end of the IEQp1-A1 VAV data input form.

2
Fri Aug 8, 2014, 12:41 pm

How to calculate effective operable area for top hung window

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SSN Energy Model  on 

Hi, We are in the initial design of an office building. The Project team has planned to provide top hung window & the building will have more naturally ventilated spaces.

4
Tue Jul 22, 2014, 7:35 pm

iEQpr1 Operable awning windows for natural ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  LEED Pro Consultant  on 

Hello, We have a building that is naturally ventilated and to comply with ASHRAE 62.1-2007 (prerrequisite) we are planning to place operable windows.

5
Tue Jul 22, 2014, 7:32 pm

Multifamily compliance with Ashrae 62.1-2004 vs 2007

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Saju Varghese  on 

We have designed project that was built recently under local code compliance that refers to Ashrae 62.1-2007, however the project was registered for LEEDv2 a while ago, therefore we designed based

2
Tue Jul 15, 2014, 10:18 pm

Guide to ASHRAE 62, and especially Natural Ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Joseph Snider  on 

Hi All, In Florida, we are constantly dealing with the Natural Ventilation section in ASHRAE 62.1-2007.

4
Managing Director
Energy Cost Solutions Group
LEEDuser Premium Member
13 thumbs up
Tue Jun 10, 2014, 5:27 pm

Fresh air provided by transfer grill

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maya Karkour  on 

Dear all, I am consulting on a big project which has small electrical rooms (~30 sq.ft) in the mechanically ventilated parking basement.

8
Fri Jun 6, 2014, 2:10 pm