Forum quick links
MRc4 - Organic compost
NC-2009 MRc4:Recycled Contentposted by Sheryl Swartzle on
Can the organic compost used for our vegetative roof be considered post-consumer recycled material?
MR Credit - 20% of WHAT number for the cutsheets
NC-2009 MRc4:Recycled Contentposted by Denise Domino on
What are going off of for the 20%? 20% Material Cost???
Reused material
NC-2009 MRc4:Recycled Contentposted by Erin Holdenried on
If a project is not pursuing MRc3, can reused material count towards MRc4 instead?
LEED Form MR 4
NC-2009 MRc4:Recycled Contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Can your contractor upload their own MR Calculator?
NC-2009 MRc4:Recycled Contentposted by Miriam Gee on
Does anyone know if the contractor can upload an internal MR Calculator for MRc4-7, or do they have to download the excel spreadsheet from the Credit Resources tab in LEED Online, complete it, and
LEED CS v3 - require actual invoices?
NC-2009 MRc4:Recycled Contentposted by eileen hughes on
General Contractor has provided LEED submittal material form but the backup information ranges from a job specific letter from the manufacturer, to information from a manufacturer web site.
Paving as part of Construction Costs
NC-2009 MRc4:Recycled Contentposted by Mariah Grife on
The new LEED language has clarified that 32.10.00 Paving should be included in the construction costs. However, the only paving that will occur on my project's contract will be in-street paving p
Clinker
NC-2009 MRc4:Recycled Contentposted by Caroline PIN on
Dear all, Is the clinker a recycled material for cement ? (Cement clinkers are formed by the heat processing of cement elements in a kiln) Thank you for your help