Showing energy savings in drug manufacturing facilities

NC-2009 EAc1:Optimize Energy Performance
posted by  CRB Sustainability  on 

Has anyone performed an exceptional alculation to demonstrate energy savings in a drug manufacturing facility for EAc1?

0

Baseline Fan power

NC-2009 EAc1:Optimize Energy Performance
posted by  S Gopikumar  on 

I’m modeling a typical office building which operates 5 days/40 hours per week. In order to comply with G.3.1.2.4, I broken out the fan power from system EER.

1
Wed Apr 10, 2013, 2:43 pm

Renewable energy in EAc1

NC-2009 EAc1:Optimize Energy Performance
posted by  VICTOR MORENO  on 

Hello. I have modeled a proposed building including PV and solar thermal systems.

1
Thu Jul 21, 2016, 8:48 pm

LEED certification for identical buildings

NC-2009 EAc1:Optimize Energy Performance
posted by  Kalyan Nishtala  on 

Hi All, We have a project coming up where LEED certification is being pursued for multiple identical villas. How does USGBC treat such a project.

1
Tue Jun 18, 2013, 1:25 pm

Energy modeling for an industrial facility

NC-2009 EAc1:Optimize Energy Performance
posted by  Mohamed M. Abd Elhameed  on 

I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans.

0

District Energy Systems

NC-2009 EAc1:Optimize Energy Performance
posted by  Matt Humphreys  on 

I have project that is purchasing chilled water from the local utility.

1
Mon Sep 9, 2013, 1:52 pm

Weather data for sizing runs

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

The equipment capacities for the baseline building design shall be based on sizing runs for each orientation (see G3.1.2.2 and G3.1.2.2.1).

0

Baseline HVAC system for a naturally ventilated Building

NC-2009 EAc1:Optimize Energy Performance
posted by  Jayanthi Raju Vadivelu  on 

In one of our projects, we've 100% naturally ventilated school building, which will have ceiling fans for comfort, a total area of approx 80,000 sqft, Ground + 2 floors.

1
Mon Dec 9, 2013, 8:05 pm

district CHP system

NC-2009 EAc1:Optimize Energy Performance
posted by  Giorgia Lorenzi  on 

I am modeling a building which is connected to a district CHP system.

1
Thu Jul 12, 2012, 6:57 pm
1
Fri Sep 3, 2010, 12:47 pm