Forum quick links
LED Lamps in Fixtures Designed for Other Lamps
NC-2009 EAc1:Optimize energy performanceposted by Pat Thomas on
We are planning to use fixtures designed for use with MR-16 or incandescent lamp but will be installing LED lamps.
Building Envelope Requirements for Continuous Insulation
NC-2009 EAc1:Optimize energy performanceposted by Myra Villalobos on
We have a project that has structural masonry walls, and interior steel studs. Appendix G requires 7.5 c.i. for our walls, so I have two questions: 1.
Process Load or Regulated Load
NC-2009 EAc1:Optimize energy performanceposted by Erin Nuckols on
In the case of a museum, is the humidification of a structure considered process load or regulated load?
ASHRAE Baseline Constructions - with two building types
NC-2009 EAc1:Optimize energy performanceposted by Alice chen on
Hi all, Has anybody have experience in working on a large warehouse connected with a small office building? I imported two baseline constructions, one is semiheated for warehouse, the other is no
Question About UPS and Power Supply Efficiency
NC-2009 EAc1:Optimize energy performanceposted by Ricardo Marques on
HI! I would like to take a question about data center's based on Ashrae 90.1 2007 for Leed 2009. In Appendix G "Performance Rating Method", in Baseline Building Performance, I have to attribute a
Energy simulation software
NC-2009 EAc1:Optimize energy performanceposted by Jakub Wiesner on
Hello, I have some experiences with energy modelling in eQuest, but I would like to change my software to something else.
Fenestration U-value: Framed versus Center-of-Glass
NC-2009 EAc1:Optimize energy performanceposted by Paul Cimaglia on
I received a review comment requesting confirmation that my modeled fenestration U-value accounts for framing. I'm having a difficult time contacting the window manufacturer.
Capturing heat recapture for absorption dhillers
NC-2009 EAc1:Optimize energy performanceposted by Vanessa Seibert on
We are working on a college campus that will have a new central plant. We have a onsite micro turbine generators that provide power to the site.