Post a question or comment
Credit Filters
Optimize Energy Performance
Filter by location
Forum
Topic
Replies
Recent

EAc1 Design Review Question - Seeking Guidance ASAP

NC-2009 EAc1:Optimize Energy Performance
posted by  Joshua Bloom  on 

If I submit EAc1 in my design review and it gets sent back as likely approved, can I still have the ability to change some things before I submit again for Construction Review?

1
Fri Apr 13, 2012, 6:46 pm

U-value unheated/heated slab-on-grade floor

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

Hello. In the building which I’m modeling there is an underground floor whose slab-on-grade floor can be considered as divided in three parts: one part (wellness) is heated with heated floor, anoth

0

USGBC Approved equivalent standards

NC-2009 EAc1:Optimize Energy Performance
posted by  Mike D  on 

The guide allows to use a USGBC approved equivalent standard for projects outside the US. Where can this list of approved standards be found?

1
Thu Apr 3, 2014, 1:50 pm
1
Tue Mar 2, 2010, 5:10 pm

CHP Electric Output

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

I have some doubts concerning Appendix D of the document “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction” http://www.usgbc.org/ShowFile.aspx?Doc

0

Exterior lighting artwork - Process Load

NC-2009 EAc1:Optimize Energy Performance
posted by  Victoria Watson  on 

Hi, I am working on a project where they are proposing a lighting installation forming a piece of artwork. They are asking whether it can be excluded from the LEED calcs.

1
Thu Aug 28, 2014, 3:59 pm
1
Sat Oct 16, 2010, 2:04 pm

Major Renvation Baseline Building Envelope Selection for Title 2

NC-2009 EAc1:Optimize Energy Performance
posted by  Jayme Buresh  on 

Hi, I know that Appendix G states that if the envelope of a building is renovated, then the existing envelope construction is used for the baseline.

0

Car Park Ventilation Fan Energy Savings

NC-2009 EAc1:Optimize Energy Performance
posted by  Chilufya Lombe  on 

Hi, on a recent project we were requested to provide evidence that 5 buildings built within the last three years did not have carbon monoxide sensors installed in the basement car parks in order to

1
Thu Nov 20, 2014, 3:35 pm

BEMwiki

NC-2009 EAc1:Optimize Energy Performance
posted by  Eddy Santosa  on 

FYI only, I believe this is useful information for LEEDuser community as well.

1
Thu Dec 20, 2012, 11:40 pm