Exterior Wall Defintion for EA Credits
NC-2009 EAp2:Minimum Energy Performanceposted by Miranda Gardiner on
I have a general code question regarding when a wall is considered interior and when it is considered exterior, as our team has looked for clear language in the NYS energy code as well as the ASHRA
U-values and SHGC
NC-2009 EAp2:Minimum Energy Performanceposted by Henrique Mendes on
USGBC is saying that the fenestration assembly U-value and SHGC value must be modeled at 4.26 and 0.25, we are changing the fenestration characteristcs in order to get as close to those values as p
Mixed use building application and Ventilation Calculations 90.2
NC-2009 EAp2:Minimum Energy Performanceposted by J.R. Anderson on
The project is registered as a LEED NC v 2009. A good portion of the building project is going to be used for living quarters. Can ASHRAE 62.2 be utilized for the Outside Air Calculation???
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building but with existing central plant that serves also another building. My question is do i have to model part of existing central or whole.
Target Finder
NC-2009 EAp2:Minimum Energy Performanceposted by Guillermo T. Adamo on
We are working on a fueling station located in Buenos Aires, Argentina. The form on leed on-line requires filling up the target finder in the Energy star website.
Kitchen Energy Model
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
In the normal case for baseline system 5-8, does a kitchen must be modeled as a separated HVAC system using system 3-4.
Exceptional Calculations
NC-2009 EAp2:Minimum Energy Performanceposted by Stephen DeGrazio on
I have a new bubilding which will be mostly a performing arts theater and school gymnasium.
additional heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
Brewery Process Load - Baseline and Proposed Case Set-up
NC-2009 EAp2:Minimum Energy Performanceposted by Xun Jia on
The brewery I am modeling has large percentage of energy consumption associated with the process load.
Energy Recovery for Baseline Air Handling Units (LEED 2009)
NC-2009 EAp2:Minimum Energy Performanceposted by Craig Hossfeld on
My proposed design has multiple AHUs supplied from a dedicated outside air AHU (DOAS) . The DOAS will be over 20,000 cfm and will have energy recovery.