How to simulate the building with no conditioned areas
NC-2009 EAp2:Minimum Energy Performanceposted by Aravindraj RB on
Our project is a garment factory building with no conditioned area, having majority floor area as production unit which is mechanically ventilated.
Baseline Case System type - Group Building
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:-
DES Baseline and Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Bas Peeters on
Dear all,
Energy source - pallets
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings
New LEED online EAp2 form?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I didn't know there was a complete overhaul on the LEED online EAp2 form until I was about to enter my results.
Humidification system
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
The energy consumption of humidification system has to be equal in baseline and Proposed building??
Is it considered process load??
CHP - Baseline Case Cost
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear Concern:-
Our Project have CHP plant (Natural Gas Generator and VAM Chiller)
In this case we have (REB) Electricity as Backup
Selection of SHW system for baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the proposed system service hot water is heated in a water tank that is heated by a hot water loop that is connected with a gas boiler.
Requirements of section 5.4.3.4 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Maurizio Sabatino Pirocchi on
Hi,
I have a question concerning requirements of section 5.4.3.4 of ASHRAE 90.1-2007.