NC-2009 WEc1:Water efficient landscapingposted by Drew Cheatham on
Can someone direct me to where in the Reference manual it states that the ratio of landscaped area to site area has to be greater than 5%?
Existing landscaping, including turf, and no irrigation
NC-2009 WEc1:Water efficient landscapingposted by Lew Bonadies on
We're renovating an Army barracks, with minimal changes to the existing landscaping, which includes turf. The landscaped area exceeds 5% of the site area.
Demolished Irrigation System
NC-2009 WEc1:Water efficient landscapingposted by Gregory Martin on
I am working on a renovation project on a college campus that has made efforts to be more sustainable.
Cistern doesn't fulfull need, but there is no-potable backup
NC-2009 WEc1:Water efficient landscapingposted by Sarah Picking on
If you can't prove that your cistern will satisfy the irrigation need every month, but the client has agreed to not have a potable backup (ie the cistern gets drained, and then the plants just live
No irrigation, No landscape - option 2 compliance
NC-2009 WEc1:Water efficient landscapingposted by Nicole Kimoto on
I'm working on a project where the existing site is 100% concrete paving. We are not providing any landscape, thus no irrigation. Does this mean we comply with option 2?
Non potable water reservoir - WEc1 -NC 2009
NC-2009 WEc1:Water efficient landscapingposted by Muriel Alvarez on
We are certifying a project NC 2009 and we are counting in our credit with a non potable reservoir outside the LEED Boundary but is within the limits of the property.
Temporary Irrigation with v6 Form
NC-2009 WEc1:Water efficient landscapingposted by Michelle Rosenberger on
Even if pursuing Option 2 Temporary Irrigation, we've always had to comply with Option 1 reductions also. The points were additive.
Landscape irrigation baseline in California
NC-2009 WEc1:Water efficient landscapingposted by Brightworks Sustainability on
With the new state wide green building code and local municipal requirements for landscape irrigation, how is a baseline developed when regional requirements now approach what was a 50% reduction?