Calculation of drawdown rate Qr
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Christian Brücher on
I have a question for a Czech colleague of mine. The have a project and want to install a stormwater storage tank. The water shall be used for toilet flushing in the building.
Pre Development & Post Development runoff rate & quantity zero
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Heather Holdridge on
We are working on a Core & Shell project on Cayman Islands and would like to pursue SS Credit 6.1 & 6.2.
a few questions on credit 6.1
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Guilherme Castagna on
I have a few questions on this credit that are buggering me off.
Pre Development Determination
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jennifer Preston on
Our site was recently demolished, filled with dirt and left for some time.
Calculating Runoff to a Rain Garden
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Christine Robbins-Elrod on
Hello, Our project is an adaptive reuse on an urban site that was previously about 95% impervious.
peak flow calculations for 24-hr duration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Chris Olson on
Hello - My question is in regards to the 2-yr, 24-hr requirement for calculating peak runoff rate.
How to quantify a evaporation rate
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian Lodes on
I was hoping I could get some advice on obtaining the quantity requirement of SS CR 6.1. We are trying to obtain this credit on an approximate 19 acre site.
SSc6.1 Pond with Flow Restrictor and Total Stormwater Volume
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Sandra Bauder on
I am having the same issue as Lucy (October 18, 2010) on one of our current projects, and the comments by Gregory and Jennifer were helpful but I still have some questions. Scenario: -existing impe