Forum quick links
Leed Footprint exceeds leed Boundary
NC-2009 SSc5.2:Site development - maximize open spaceposted by Jorge Lopez de Obeso on
Hi, I'm having some problems with a project.
Athletic Field included under SSc5.2, but excluded under WEc1?
NC-2009 SSc5.2:Site development - maximize open spaceposted by Lisa Milano on
There is an existing athletic field within our project's LEED boundary that we would like to include in our calculation for SSc5.2 in order to earn exemplary performance.
what is the exact definition of footprint
NC-2009 SSc5.2:Site development - maximize open spaceposted by ebru unver on
hi everyone, we re working on a project in Turkey İstanbul in which we will be applying for this credit. But we re having a hard time on deciding what the building footprint is.
Lots and open space question
NC-2009 SSc5.2:Site development - maximize open spaceposted by Albert Sagrera on
Hello, We are wondering if a future building occupying two different plots can be considered as a single LEED project or not. In the case that it is considered as a single project, as it affects
Building Footprint
NC-2009 SSc5.2:Site development - maximize open spaceposted by O Moltay on
We have a residential project. My question about with building footprint. First floor have corbelled balcony. So, ground floor footprint excluded, balcony.
Artificial Turf
NC-2009 SSc5.2:Site development - maximize open spaceposted by Katrina Rosa on
For a mixed-use project (1st story commercial, top 7 multi-family residential), in an urban setting (achieves Community Connectivity SSc2): can artificial turf on the roof deck contribute to achie
Required Signatory SSc5.2-1. Owner/Agent
NC-2009 SSc5.2:Site development - maximize open spaceposted by Aldo Pazo on
Hello everyone!! Could anyone explain what's required in point Upload SSc5.2-RS1?
Pool
NC-2009 SSc5.2:Site development - maximize open spaceposted by Jorge Lopez de Obeso on
If SSc2 is achieved, would a swimming pool count towards credit achievement? I´d think so, however I read other posts and there is a comment that says no... Does anyone have a positive feedback a
All open space that is counted toward this credit will be preser
NC-2009 SSc5.2:Site development - maximize open spaceposted by Agnieszka Rylska on
As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building".