Forum quick links
New Construction
NC-2009 PIf1:Minimum Program Requirementsposted by Hugh Hagues on
I have a building opened in 1989. Subsequent extension were constructed in 2003. Can I classify the extensions as "new construction?"
LEED Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Sasha Peters on
We are currently working for a LEED project which is spread across the project plot area with two office buildings (one “Administrative”- and the other “General”), three warehouses (all unconditio
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,
ABOUT THIS FORUM
NC-2009 PIf1:Minimum Program Requirementsposted by Tristan Roberts on
This LEEDuser forum is intended to cover Project Information Form 1, which is about documenting compliance with the MPRs.
LEED EBOM on Industrial Buildings
NC-2009 PIf1:Minimum Program Requirementsposted by Ricardo Sá on
I am aware that LEED for Existing Buildings: Operations & Maintenance is applicable to any commercial and institutional buildings, however, I would like to hear your opinion whether it is suita
LEED boundary for a railway station
NC-2009 PIf1:Minimum Program Requirementsposted by Juan Sergio Simborio on
LEED NC 2009 Our project is a major railway station in Qatar.
Defining 'one building'
NC-2009 PIf1:Minimum Program Requirementsposted by Erin Holdenried on
I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?
Can
NC-2009 PIf1:Minimum Program Requirementsposted by Qiang Zhang on
I have a critical issue about the LEED v4 boundary, i have attached several images for your reference. To discuss with the developer, we are going to certify the 1 2 3 4 as a whole building, 1 is
Rehabilitation of a historic building
NC-2009 PIf1:Minimum Program Requirementsposted by Veronica Reed on
Hello we are working on a rehabilitation project for a small hotel being developed in an existing historic building in Quito, Ecuador.
EBOM v4 VS EBOM v2009
NC-2009 PIf1:Minimum Program Requirementsposted by DAVIDE FILIPPI on
Hey everyone! I'm new here. I'm an italian student of a Master, and I'm starting to study Leed for EBOM. I don't have the reference guide of this rating system, I hope it will arrive soon.