Post a question or comment
Credit Filters
Minimum Program Requirements
Filter by location
Forum
Topic
Replies
Recent

New Construction

NC-2009 PIf1:Minimum Program Requirements
posted by  Hugh Hagues  on 

I have a building opened in 1989. Subsequent extension were constructed in 2003. Can I classify the extensions as "new construction?"

1
Mon Nov 19, 2012, 3:21 pm

LEED Site Boundary

NC-2009 PIf1:Minimum Program Requirements
posted by  Sasha Peters  on 

We are currently working for a LEED project which is spread across the project plot area with two office buildings (one “Administrative”- and the other “General”), three warehouses (all unconditio

1
Tue Sep 3, 2013, 3:20 pm

One single building

NC-2009 PIf1:Minimum Program Requirements
posted by  MKK LEED  on 

We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,

1
Thu Oct 22, 2015, 5:40 am

ABOUT THIS FORUM

NC-2009 PIf1:Minimum Program Requirements
posted by  Tristan Roberts  on 

This LEEDuser forum is intended to cover Project Information Form 1, which is about documenting compliance with the MPRs.

0

LEED EBOM on Industrial Buildings

NC-2009 PIf1:Minimum Program Requirements
posted by  Ricardo Sá  on 

I am aware that LEED for Existing Buildings: Operations & Maintenance is applicable to any commercial and institutional buildings, however, I would like to hear your opinion whether it is suita

1
Thu Jun 20, 2013, 3:23 pm

LEED boundary for a railway station

NC-2009 PIf1:Minimum Program Requirements
posted by  Juan Sergio Simborio  on 

LEED NC 2009 Our project is a major railway station in Qatar.

1
Thu Dec 19, 2024, 4:28 am

Defining 'one building'

NC-2009 PIf1:Minimum Program Requirements
posted by  Erin Holdenried  on 

I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?

1
Wed Nov 7, 2012, 3:03 pm

Can

NC-2009 PIf1:Minimum Program Requirements
posted by  Qiang Zhang  on 

I have a critical issue about the LEED v4 boundary, i have attached several images for your reference. To discuss with the developer, we are going to certify the 1 2 3 4 as a whole building, 1 is

1
Mon Aug 12, 2013, 3:09 pm

Rehabilitation of a historic building

NC-2009 PIf1:Minimum Program Requirements
posted by  Veronica Reed  on 

Hello we are working on a rehabilitation project for a small hotel being developed in an existing historic building in Quito, Ecuador.

0

EBOM v4 VS EBOM v2009

NC-2009 PIf1:Minimum Program Requirements
posted by  DAVIDE FILIPPI  on 

Hey everyone! I'm new here. I'm an italian student of a Master, and I'm starting to study Leed for EBOM. I don't have the reference guide of this rating system, I hope it will arrive soon.

1
Mon Jan 13, 2014, 6:42 pm