SS Credit: Rainwater Management - Option 2 - Natural land cover conditions
CS-v4.1 SSc4:Rainwater Managementposted by Finance Team on
Hi All,
We are working on a major renovation of an office project (shell only) and aim to certify it under the LEED v4.1 BD&C CS scheme.
2
Tue Sep 17, 2024, 9:19 pm
Option 2. Natural land cover conditions (3 points except Healthcare, 2 points Healthcare)
CS-v4.1 SSc4:Rainwater Managementposted by Ammar Yahia on
As we have 203,000 sqm site area within LEED boundary, with a majority of impervious roof, non-roof driveways, walkways, and landscape areas, basements extend on 100% of site area.
1
Wed Oct 9, 2024, 9:37 am
Collected rainwater used for flush fixtures (toilets)
CS-v4.1 SSc4:Rainwater Managementposted by Sofía Rizo on
The new v4.1 requirements for credit Rainwater Management - option 1, state that "The percentile event volume must be retained (i.e.
0
run off volume calculation methodology - help needed
CS-v4.1 SSc4:Rainwater Managementposted by Konstantina Kalliakoudi on
Hello to all Leed users,
I am new at this credit. I have a project in which I want to implement Option 1.
1
Wed May 8, 2024, 8:45 pm