HPD - predicted by process chemistry
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Suzanne Drake on
"Predicted by process chemistry" is indicated on the HPD I am reviewing. Is this acceptable in any way toward the Building Product Disclosure credit?
Option 1 - HPD Residual Disclosure
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Dalton Ho on
Option 1 requirements state that for the HPD to be applicable, the “HPD standards for the 1,000-ppm level must be attained and the appropriate box on the summary page checked”.
Dimension of entryway systems
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hi, We are trying to apply this credit in a small office building, so we want to know if the dimension of entryway systems can be modified due to three meters is a very large distance in a building
Cyclist provision for hotels
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I am currently working on the LEED assessment of a hotel.
What is considered "individual energy end use"?
NC-v4 EAc3:Advanced energy meteringposted by Dave Hubka on
My project is a manufacturing building where the "widget makers" consume about 75% of the total annual energy.
MPR
NC-v4 MPR1:Must be in a permanent location on existing landposted by Eduardo Straub on
Are there only 3 MPRs for LEED V4? What did happen with the 4 others?
NC-v4 LTc2: Sensitive land protection/Wetland Protection
NC-v4 LTc2:Sensitive land protectionposted by Robyn Dowsey on
Is there a precedent anywhere for getting this credit with wetland mitigation plan where small inactive wetlands were included in the project footprint but an equal or greater wetland area was purc
CHP Modeling guidance
NC-v4 EAp2:Minimum energy performanceposted by Paula Rantanen on
Our project building is served by CHP system which generates both heat energy and electricity.
Option 2
NC-v4 SSc4:Rainwater managementposted by henry nguyen on
Hello, I wonder how should I understand Opt.2 BD+C Rain water Mgmt credit. "Manage on site the annual increase in runoff volume from the natural land cover condition to the post-developed conditio
monitoring
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Is the monitoring of mechanical ventilation always mandatory or do exceptions exist? Regards