Forum quick links
Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%
NC-v4 WEc1:Outdoor water use reductionposted by Jing Zhang on
Outdoor Water Use Reduction Credit Does option 2 means, if reduction ranges from 50% to 100%, then, at least 30% need to be achieved only through plant and irrigation system efficiency.
Budget Method
NC-v4 EQc2:Low-emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
Product Specific & Industry EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Leanne Conrad on
Our project may be able to obtain this credit, but it might come down to the last half value for an industry EPD.
EAp2:Table 1.4 based on ASHRAE 90.1-2010
CS-v4 EAp2:Minimum energy performanceposted by CHRISTOPHE MATHIEU on
Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard
Campus Project Guidance
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Philippa Cameron on
Hi. We have a Campus school project with 4 buildings to be certified under v4, two of which are to be BD+C for Schools and the other BD+C NC.
Renewable Energy Cost Saving for LEEDv4
NC-v4 EAc2:Optimize energy performanceposted by Daniel Ohnuma on
The LEED v4 Guide steps that it's possible only apply any savings from ON-SITE renewable energy systems?
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
Natural ventilation openings' control
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
According to ASHRAE 62.1 - 2010 User's Manual, example 6-AF, the requirement associated with controls that guarantee that the openeings remain open during occupancy can be met with an administrativ
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?