Forum quick links
Reduced parking footprint for College/University
NC-v4 LTc7:Reduced parking footprintposted by Iris Amdur on
The project is a single building which is part of a larger educational campus.
Building Eligibility + Project Boundary
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Julia Perez on
Hi I have a bit of a particular project here, let me explain. We want to certify 5 office buildings under LEED v4 EBOM.
Percentage below water consumption maximum
EBOM-v4 WEp1:Indoor water use reductionposted by on
If the percentage below water consumption maximum is calculated to be -22% (not 0%) by using the calculator, is the pre-requisite met or not?
Calculation
NC-v4 EAc7:Green power and carbon offsetsposted by Vitor Tosetto on
Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.
Bus Stops
NC-v4 LTc5:Access to quality transitposted by Florencia Guggenheim on
Hi, i would like to know in the case i have one bus stop but with different bus lines, can i count de trips from every line or just of one of them? thank you very much!
EPR Example
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jenelle Shapiro on
Does anyone have an example of compliant EPR documentation?
Through Connections
ND-v4 NPDc6:Connected circulation networkposted by Martine Desbois on
Could you please clarify if through connection can be pedestrian only. Thank you
Exhaust monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Do monitoring requirements also apply to spaces which only have exhaust requirements as per ASHRAE 62.1 - 2010 (e.g. toilets)? Thanks in advance!
Example of a populated BPDO calculator with all tabs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jaspreet Pahwa on
Project Location: United States Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are
Workstation Components and C2C Certification
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hi there! Some Cradle to Cradle (C2C) certifications notes exclusions.