Forum quick links
PV System on Campus Project
CS-v4 EAc5:Renewable energy productionposted by Annalise Reichert on
I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.
Minimum Energy Performance Calculator - Receptacle Equipment
NC-v4 EAp2:Minimum energy performanceposted by Mark Zoeteman on
Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p
Parking Garage considered Exterior Fixtures?
EBOM-v4 SSc4:Light pollution reductionposted by Rachel Shepherd on
I am currently working on a project that has a covered, above ground parking garage within the site boundary. Are the fixtures within the parking garage considered interior or exterior fixtures?
O+M Starter Kit - Systems O+M Plan
NC-v4 INc1:Innovationposted by Kelsey Jensen on
Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource?
DDA Boundary
NC-v4 LTc3:High priority siteposted by Trevor Anderson on
Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?
Renewable sources area = calculation exception?
NC-v4 SSc3:Open spaceposted by Kristina Pobre on
Is the area for on-site renewable sources an exception to the calculation from the 30% site area?
Exemplary Performance and Regional Priority
CI-v4 EAc2:Optimize energy performanceposted by Kerry Honsinger on
My reference guide states that this credit is eligible for exemplary performance on the Quick Reference table on page 17. It is also eligible for Regional Priority credit.
Switching between Options 1 and 2
CI-v4 EAc2:Optimize energy performanceposted by Meike Borchers on
We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.
v4 EAp2 Energy savings by cost or units of energy?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Tyra Sorensen on
Is this still based on cost or is this now based on actual energy savings?
n/a
NC-v4 SSc6:Light pollution reductionposted by Heather Holdridge on
If I understand the LEED requirements for exterior lighting, we will be following the BUG guidelines for all lighting that will remain on from sunset to sunrise.