PV System on Campus Project

CS-v4 EAc5:Renewable energy production
posted by  Annalise Reichert  on 

I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.

1
Tue Jan 24, 2017, 3:16 pm

Minimum Energy Performance Calculator - Receptacle Equipment

NC-v4 EAp2:Minimum energy performance
posted by  Mark Zoeteman  on 

Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p

1
Wed Apr 1, 2015, 11:40 pm

Parking Garage considered Exterior Fixtures?

EBOM-v4 SSc4:Light pollution reduction
posted by  Rachel Shepherd  on 

I am currently working on a project that has a covered, above ground parking garage within the site boundary. Are the fixtures within the parking garage considered interior or exterior fixtures?

0

O+M Starter Kit - Systems O+M Plan

NC-v4 INc1:Innovation
posted by  Kelsey Jensen  on 

Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource?

1
Mon Nov 16, 2015, 3:10 pm

DDA Boundary

NC-v4 LTc3:High priority site
posted by  Trevor Anderson  on 

Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?

1
Thu Apr 21, 2016, 3:27 pm

Renewable sources area = calculation exception?

NC-v4 SSc3:Open space
posted by  Kristina Pobre  on 

Is the area for on-site renewable sources an exception to the calculation from the 30% site area?

1
Wed Jun 7, 2017, 4:49 pm

Exemplary Performance and Regional Priority

CI-v4 EAc2:Optimize energy performance
posted by  Kerry Honsinger  on 

My reference guide states that this credit is eligible for exemplary performance on the Quick Reference table on page 17. It is also eligible for Regional Priority credit.

1
Tue Nov 15, 2016, 11:20 pm

Switching between Options 1 and 2

CI-v4 EAc2:Optimize energy performance
posted by  Meike Borchers  on 

We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.

0

v4 EAp2 Energy savings by cost or units of energy?

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  Tyra Sorensen  on 

Is this still based on cost or is this now based on actual energy savings?

1
Wed Oct 8, 2014, 1:00 pm

n/a

NC-v4 SSc6:Light pollution reduction
posted by  Heather Holdridge  on 

If I understand the LEED requirements for exterior lighting, we will be following the BUG guidelines for all lighting that will remain on from sunset to sunrise.

0