Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Dumpster sizes for the recyclables during the construction ?

CS-v4 MRp1:Storage and collection of recyclables
posted by  Marine Petrosyan  on 

Hi, LEED Users!


Can you please help me figure out, whether the dumpster sizes for the recyclables in the construction area should meet any standard under CS-v4 MRp1?

3
Project Manager
Energy Systems LLC
LEEDuser Basic Member
0 thumbs up
Tue Mar 26, 2024, 1:18 am

Is Zoysia japonica turf?

NC-v4 WEp1:Outdoor water use reduction
posted by  Linh Dang  on 

Dear all LEED user expert

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Tue Mar 26, 2024, 1:13 am

Commercial Kitchen Query

CI-v4 EAp2:Minimum energy performance
posted by  padma priya  on 

In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. 

2
Sustainability Project Manager
The Sheward Partnership
LEEDuser Premium Member
0 thumbs up
Mon Mar 25, 2024, 1:48 pm

Modeling only conditioned area

NC-v4 EAp2:Minimum energy performance
posted by  Omar Elrawy  on 

I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 25, 2024, 5:38 am

Irrigation Establishment Period Flexibility / Regional Adjustments

NC-v4 WEp1:Outdoor water use reduction
posted by  Pooja Sannamani  on 

For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-year

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Mar 25, 2024, 1:28 am

Walk off mats for skyway entrance

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  SIG - Sustainability Main Account  on 

Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "regularly used exterior entrance", thus require a walk off mat?

1
Fri Mar 22, 2024, 8:16 pm

Storage location

NC-v4 MRp1:Storage and collection of recyclables
posted by  Maiz Rech  on 

Is there a minimum distance or positioning requirement for this area?

Would it be a problem to locate the recyclables storage on the building underground floor?

3
Vivá Consultoria
LEEDuser Basic Member
0 thumbs up
Fri Mar 22, 2024, 6:28 pm

Buildings within site but not under LEED scope

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Marwa Elzoghby  on 

I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope.

0

Gross Floor Area

CI-v4 MPR3:Must comply with project size requirements
posted by  Edgar Arevalo  on 

For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage.  Since gross floor area also includes the exterior wall

0

Exterior Illuminated Signage

EBOM-v4 MRc2:Purchasing - lamps
posted by  Kristina K  on 

Hello,

Does this credit apply to Exterior Illuminated Signage?

Thank you

0