IAQp1 Compliance Method for Naturally Ventilated Rooms/Buildings in Europe
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Chenlu Li on
Hi,
Option 2 IAQ Testing
NC-v4 EQc4:Indoor air quality assessmentposted by Robert Cashins on
Are there guidelines on how to determine how many air samples need to be collected to comply with the IAQ Assessment requirement?
Pressurized entryway vestibules at high-volume building entrances
Healthcare-v4 EQc1:Enhanced indoor air quality strategiesposted by Priscillia Champagne on
Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances.
Heat Island Reduction
NC-v4 SSc5:Heat island reductionposted by Jose Castorena on
In this credit under option 1 the standard formula includes a vegetated roof.
Flush-out option preferred, but some furniture delivery delayed
NC-v4 EQc4:Indoor air quality assessmentposted by Erica Downs on
The project contractor intends to do a full flush-out prior to occupancy. Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arriv
District cold storage project
NC-v4 EAp2:Minimum energy performanceposted by Ryan Wang on
Hi all experts,
Purple Roof
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution. From the looks of it, it's a green roof solution with optimized stormwate
Entryway system
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by RAMON CHRISTOPHER MEDRANO on
I have a office space project, that will have an entryway system (walk off matt).
LEED ND Plan on Indoor Water Use Reduction
ND-Plan-v4 GIBp3:Indoor water use reductionposted by Michael Wahjudi on
Hi all,
Minimum Program Requirements - Must use a reasonable site boundary: site + building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Theresa Lehman on
This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.