Forum quick links
when does REC contract have to be dated?
NC-v4 EAc7:Green power and carbon offsetsposted by Carolina Cohen Freue on
I am trying to pursue Green Power and Carbon Offsets credit.
Commercial Washer and Dryer requirements for NC- K12 project, LEED v4
NC-v4 EAp2:Minimum energy performanceposted by Divya Shroff on
We are looking to specify a commercial washer dryer for a high school project. The LEED requirement for a commercial washer is atleast 120000 lbs for laundry per year.
District Energy for Partial Building Load
NC-v4 EAp2:Minimum energy performanceposted by Jess Scanlon on
I am modeling a new building on a university campus following LEEDv4 Option 1, Whole Building Energy Simulation.
Flooring with resin coated broadcast quartz
NC-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
I have seen several flooring product systems now with resins and coatings that use a broadcast quartz or other inherently non-emitting material as one layer.
Regd. consideration of miscellaneous loads in both proposed & baseline cases as per ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello all,
G3.1.1 exception d exhaust hood airflow baseline
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi All,
Regd. Baseline Systems to be used for Buildings with both Cooling & Heating as per ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello everyone,
We are having a datacenter project which requires both cooling and heating as the outdoor temperatures vary from -20 degree C to 45 degree C.
Location and Product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lance Kinard on
Hello All,
Regd. night cycle allowed in proposed & baseline energy modelling using ASHRAE 90.1 PRM
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello all,