One-Time Potable Water Analysis
Pilot-Credits WEpc17:Cooling tower water useposted by Edward Malesevich on
When the credit requirements ask for a "one-time" potable water analysis to be conducted, what sort of time-frame is required for this to be completed?
LEED HC WEc4.2 vs Pilot Credit 17
Pilot-Credits WEpc17:Cooling tower water useposted by April Eisenhauer on
A long-term healthcare project I have been working on that was registered under LEEDv2.2 recently got resistance for submitting LEED HC WEc4.2 as an ID credit.
One-time potable water analysis
Pilot-Credits WEpc17:Cooling tower water useposted by WAGNER OLIVEIRA SILVA on
In the new version of Pilot credit Revised at 1/3/2012 they ask to be done one-time potable water analysis. How do we do if our project already covers 100% makeup water with non-potable water?
questions of Install Drift Eliminators and minimum efficiencies
Pilot-Credits WEpc17:Cooling tower water useposted by Jie Zhang on
In the pdf download from usgbc.org, one of the credits requirements is 'install drift eliminators that achieve minimum efficiencies of 0.2% for counter-flow systems or 0.5% for cross-flow system'.