Streetside landscaped but not trees

Pilot-Credits PC14:Walkable Streets
posted by  Trinidee Shelton  on 

We are wrapping up design for a project that is a Nature Center and are specifying native grasses along the street edge.

2
Default Avatar
Associate
Aurecon
LEEDuser Basic Member
0 thumbs up
Mon Jun 8, 2015, 2:14 pm

Street trees exception?

Pilot-Credits PC14:Walkable Streets
posted by  Julia Sokol  on 

My project has facades running along 2 sidewalks at the intersection of 2 streets.

2
Principal
VvS | Architects & Consultants
LEEDuser Basic Member
23 thumbs up
Fri May 8, 2015, 6:33 am

SSpc14 Walkable project Site

Pilot-Credits PC14:Walkable Streets
posted by  Amanda Johnson  on 

I am trying to register for this Pilot Credit (which is not listed as closed) Both LEED Online and LEED User link to the USGBC Credit Library, but in the credit Library I find no link to register.

3
Fri Apr 3, 2015, 3:28 pm

Non-motorized rights-of-way

Pilot-Credits PC14:Walkable Streets
posted by  Florian Schmidtchen  on 

We have a building located in a pedestrian area. The only "street frontage" faces directly to this 20 m wide area.

2
Default Avatar
Technical Director
Perkins+Will
LEEDuser Basic Member
0 thumbs up
Wed Apr 1, 2015, 2:26 am

Service Bay Entries

Pilot-Credits PC14:Walkable Streets
posted by  Anthony Bandy-Zalatoris  on 

The architect of our project created a design where there is no "back" of the building - the street-side elevation is nearly identical to the rear (parking lot and service side).

2
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Sun Sep 21, 2014, 9:13 pm

Existing sidewalk inclusion?

Pilot-Credits PC14:Walkable Streets
posted by  emily reese moody  on 

Hi, I would like to attempt this credit for several of my current and future LEED projects.

4
Thu May 9, 2013, 9:12 pm

Historic Building Project

Pilot-Credits PC14:Walkable Streets
posted by  Pamela Mendez  on 

Our project is a major renovation of a historic building in a historic distric.

3
Fri Oct 12, 2012, 1:48 pm

Facade along the Sidewalk

Pilot-Credits PC14:Walkable Streets
posted by  Candace Small  on 

I am looking for guidance on the following credit requirement: “If a façade extends along a sidewalk, no more than 40% of its length or 50 feet (15 meters), whichever is less, is blank (without do

3
Mon Sep 17, 2012, 9:43 pm

What is the correct way to find the width of the street?

Pilot-Credits PC14:Walkable Streets
posted by  Grace Heicher  on 

The credit requirements do not seem to be consistent in defining the street width.

2
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Mon Dec 19, 2011, 12:11 pm

Estimated crown diameter

Pilot-Credits PC14:Walkable Streets
posted by  Christina Lynch  on 

Does anyone have a good resource for or way of calculating a tree's estimated crown diameter? (Benchmark "m" for NC/CS or "f" for Schools). Thanks!

3
Default Avatar
Atkins
LEEDuser Basic Member
7 thumbs up
Thu May 5, 2011, 7:44 pm