Repealed?
Pilot-Credits PC14:Walkable Streetsposted by Kath Williams on
If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?
All or the Main street frontages 1:1.5
Pilot-Credits PC14:Walkable Streetsposted by Ian McCall on
Dear All, The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”.
Compliance for Existing Site Features
Pilot-Credits PC14:Walkable Streetsposted by Vicki Rybl on
I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.
Non-Motorized Right-of-Way
Pilot-Credits PC14:Walkable Streetsposted by Andrew Greene on
Two items: 1) A clarification of the language on non-motorized rights-of-way guidance. 2) A question whether the minimum height ratio is an appropriate measure of walkability in campus settings. 1
Sidewalk clarification
Pilot-Credits PC14:Walkable Streetsposted by Michelle Oishi on
One of the requirements states, "At-grade crossings with driveways account for no more than 10% of the length of sidewalks within the project".
Line of sight at intersections
Pilot-Credits PC14:Walkable Streetsposted by Katie Peterschmidt on
Hello - has anyone had an issue with Requirement #9: where should the 50' tree spacing start from a busy intersection?
building-height-to-street-width ratio
Pilot-Credits PC14:Walkable Streetsposted by Eric Carbonnier on
How does the building-height-to-street-width ratio promote walkable environments?
Entrance lobby as live-work space
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
In my project there is a main entrance lobby that includes a permanently manned reception.
Connection of sidewalks
Pilot-Credits PC14:Walkable Streetsposted by Karyn Rodrigues on
For this credit, one of the requirements is "Continuous sidewalks [...] serve all buildings [...] and connect them with public sidewalks.".
Implementing on a university campus
Pilot-Credits PC14:Walkable Streetsposted by Dee Spiro on
When I searched the forum for insight on how to apply/adapt some of the requirements for a campus setting, the posts were from way back in August 2012.