Forum quick links
PC 9
Pilot-Credits PC9:Street Networkposted by Nate Steeber on
I really like this credit, and I think it shows a value to choosing a home locations that was otherwise unnoticed. I do, however, have some questions about intersections, and some options that may
street network
Pilot-Credits PC9:Street Networkposted by Sara Aschliman on
It appears that our project will qualify for this point, and I do believe that the spirit of the credit positively reinforces the walkability of our neighborhood site as the increased intersections
PC 9 - Open & Connected Community
Pilot-Credits PC9:Street Networkposted by albert kovacik on
We were on the cusp of Gold level until our review came back with several points deducted from our energy model.
Pedestrian Connectivity
Pilot-Credits PC9:Street Networkposted by Shiva Prakash on
I agree with comments made regarding the intent of the credit including pedestrian access.
Denial of PC9 for non-compliance w/ technical requirements
Pilot-Credits PC9:Street Networkposted by Michael Miller on
We had registered our CI project for PC9 prior to the change to the credit that limited it to Homes projects.
LEED H Pilot Credit 9
Pilot-Credits PC9:Street Networkposted by Alexander Morris on
I agree with Jon Jensen's comment above that a 4-way intersection with one leg that leads to a cul-de-sac is not materially different in terms of connectedness to a 3-way intersection where all thr
Definition of Intersections
Pilot-Credits PC9:Street Networkposted by Ricky Li on
Hi, I am trying to apply this credit to one of my project. The credit requirement states that "Publicly accessible alleys may be counted" as intersections.
geographic issues
Pilot-Credits PC9:Street Networkposted by Christina Lynch on
The project site I am dealing with has a varied topography (outside Pittsburgh, PA), and I believe the geographic limitations of the site and surroundings made it difficult to meet the required thr