How many sample locations for measurement?

CI-v4 EQc9:Acoustic performance
posted by  Brian Salazar  on 

I am looking to take mic measurements of the ambient noise in our space to provide a baseline for HVAC Background Noise.  The Acoustic performance Calculator specifies the following:

2
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Wed Aug 24, 2022, 3:29 pm

Use of alternative standards - UK

CI-v4 EQc9:Acoustic performance
posted by  R Jones  on 

Hi - what other standards are allowed as an equivalent to the ASHRAE standard? is the British Council for Offices (BCO) guidance accepted for all parts ?

 

thanks 

0

adjacent spaces outside scope of work?

CI-v4 EQc9:Acoustic performance
posted by  Erin Holdenried  on 

For LEED projects that consist of tenant space within a larger building, do they have to consider adjacencies to spaces outside the scope of work?  

1
Thu Feb 3, 2022, 10:24 pm

Is it ok to have furniture installed when measuring T60 (reverberation)?

CI-v4 EQc9:Acoustic performance
posted by  BEE Incorporations  on 

I suspect it's ok but I just want to be sure because it's not indicated in the LEED Guide. Thank you.

0

Bar Space

CI-v4 EQc9:Acoustic performance
posted by  Kevin Gilleran  on 

Hi. We are working on a TI within a shell building which will have a bar, seating, lounge area, kitchen prep areas with support spaces and its own restrooms. No office function etc.

2
Partner
Longman Lindsey
LEEDuser Expert
6 thumbs up
Fri Aug 24, 2018, 5:59 pm

Office, conference room to Hallway, stairs STCc Interpretation

CI-v4 EQc9:Acoustic performance
posted by  Jeffrey Fullerton  on 

In this credit, there is a requirement for an STCc 50 rating for "Office, conference room" to "Hallway, stairs".

1
Wed Aug 8, 2018, 1:52 pm

Copy area in office - acoustical treatment

CI-v4 EQc9:Acoustic performance
posted by  Leticia SooHoo  on 

Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.

1
Thu Jan 19, 2017, 9:22 pm

TI scope vs. CS base building

CI-v4 EQc9:Acoustic performance
posted by  Michelle Rosenberger  on 

How do we achieve this credit based only on TI scope of work?

1