Forum quick links
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Tom Martin on
Has the pressure differential requirement of at least 5 pascals for LEED v2009 IEQc5 Indoor and Chemical Source Pollutant Control been eliminated from the requirement of this credit?
Exhaust monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Do monitoring requirements also apply to spaces which only have exhaust requirements as per ASHRAE 62.1 - 2010 (e.g. toilets)? Thanks in advance!
Door arrest systems or free-swinging closers allowed?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Is it allowed to install additional door arrest systems or free-swinging closers to the self-closing doors, so that in case the occupant is able to keep the door open for a short period?
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Mark Zoeteman on
Option 1, Enhanced IAQ Strategies, paragraph B states spaces are to be exhausted where hazardous gases or chemicals may be present or used.
Small entryways
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Sara Johansson on
Hello, What if a project has small retail stores on the bottom floor, less than 3m long, and the ground outside doesn't belong to the property owner but the municipality (and therefor not possible
Elevator lobbies -with airlocks?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.
Not Regularly occupied
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Phillip Cook on
In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.
ACP for India
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Renu Rani on
Is there any ACP available for India?
Additional Enhanced IAQ Strategies
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Marina Curto on
In this credit, two options are available, Options 1 and 2. Can a project achieve Option 2 only without pursuing Option 1?
Checklist states 2 points possible
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Parker williams on
Are you allowed to do both options for this credit? 2 points possible or 1?