RE split between on site production and lease agreement
NC-v4 EAc5:Renewable energy productionposted by Jason Garvens on
Can a project split the source of renewable energy used on site between their own on site system and making up the rest through a purchase agreement with a community RES?
Example:
Utility Service Area
NC-v4 EAc5:Renewable energy productionposted by Johanna Scogin on
I'm confused as to the wording for solar gardens or community renewable energy systems (off-site): "The system is located with the same utility service area as the facility claiming the use." Does
Addenda item from 1/5/2018 - Required Documentation table
NC-v4 EAc5:Renewable energy productionposted by Erica Downs on
Hello - I was reviewing the Reference Guide addenda items, and there is one for this credit that just does not make sense. It is regarding the Required Documentation table, page 439 in the RG
Community choice aggregation (CCA) programs?
NC-v4 EAc5:Renewable energy productionposted by Kristen Magnuson on
San Francisco's Public Utility Commission offers a currently-optional program called Clean Power SF. Electricity for the program is supplied by local renewable sources.
Akvifer
NC-v4 EAc5:Renewable energy productionposted by Sara Johansson on
Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.
Solar PV Array Ownership
NC-v4 EAc5:Renewable energy productionposted by Gray Bender on
Hello, I have a question about the ownership of a solar PV array, and how that effects this and any other credit.
Aerothermal Energy
NC-v4 EAc5:Renewable energy productionposted by Helena Garcia on
We're designing a system based on renewable energy installation for new construction. A part of this installation would performed by aerotermal energy.
energy used on-site vs sold energy
NC-v4 EAc5:Renewable energy productionposted by LEEDme Lorenzi on
I’m reading the new version of the reference guide and I have some doubts concerning this credit. As example, within the LEED boundary electricity is produced by pv panels.
Renewable Energy Production - point calculation
NC-v4 EAc5:Renewable energy productionposted by juyew tang on
hi, i am new with this LEED. now i design for a new project. under this NC-V4, EAC5, is the point award still based on the below table? percentage of on-site renewable energy LEED point 1%
Third party in renewable energy
NC-v4 EAc5:Renewable energy productionposted by soha yamani on
I am reading the below paragraph from the reference guide and i don't quite understand it , as it is really confused with the Green power credit?