Code is surpassing 90.1-2010

NC-v4 EAp2:Minimum energy performance
posted by  Amrit Kaur  on 

In a Jurisdiction where code is surpassing ASHRAE 90.1-2010 LEED buildings are required (by code) to meet the more stringent requirements but measure their energy score based improvement from ASHRA

1
Mon Dec 5, 2016, 3:12 pm

Proposed Case-Process Load

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, Is there any limitations in LEED V4 regarding process energy that it should be minimum 25% (In proposed case) of the baseline energy cost for the building.

1
Wed May 24, 2017, 4:24 pm

DES Path 2 Engineering Analysis for Losses

NC-v4 EAp2:Minimum energy performance
posted by  Ryan Hoffman  on 

The LEED v4 Reference Guide offers three was of determining equipment efficiencies, distribution losses, and distribution pumping energy: Monitored data, engineering analysis, and default values.

1
Tue Aug 22, 2017, 1:47 pm

Data center - Baseline HVAC System

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Hi Markus and all coleagues, In the Data center I'm about to start modeling, there are 4 IP rooms. Each of these rooms has IP load with a power density of 3.2 kW/m2 or 297 W/ft2.

1
Tue Sep 2, 2014, 1:18 pm

leed modelling software

NC-v4 EAp2:Minimum energy performance
posted by  sam Alfassy  on 

We would like to know if Design builder is approved for leed credits EAp2 and EAc2. We understand that it is more versatile than eQuest. any thoughts? Thanks!

1
Wed Dec 2, 2015, 2:13 pm

Using different energy rates between CHP Proposed and Baseline

NC-v4 EAp2:Minimum energy performance
posted by  Mark Benson  on 

I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Aug 29, 2017, 8:38 pm

Is this plant qualified as a DES?

NC-v4 EAp2:Minimum energy performance
posted by  Aru Sau  on 

1. We registered the project as Campus consisting 3 Buildings. Central Plant Building and the future building is not included in the LEED boundary. 2.

3
LEEDuser Basic Member
4 thumbs up
Fri Aug 25, 2017, 2:43 pm

District Energy Systems

NC-v4 EAp2:Minimum energy performance
posted by  Bob Crowell  on 

Marcus or anyone who knows the answer, I have a squash facility that is being added on to an existing building. The LEED Boundary does not include the plant. 1) The existing plant serves only one

5
Default Avatar
Vice President / Principal
2rw Consultants, Inc.
LEEDuser Basic Member
1 thumbs up
Thu Aug 10, 2017, 9:42 pm

Energy modeling for LEED BD+C: Core & Shell

NC-v4 EAp2:Minimum energy performance
posted by  Hanh Truong  on 

Dear all, We have a project targeting LEED BD+C: Core & Shell. My question is how to model whole-building energy simulation?

2
Tue Aug 1, 2017, 3:00 pm

occupancy sensor in big offices

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2". Does it mean that for bigger offices (i.e.

5
Thu Jul 20, 2017, 4:08 pm