Forum quick links
Walkable Streets: Sidewalk Width
ND-v2009 NPDp1:Walkable streetsposted by Aaron Ryan on
Our project has a block in which each block face is lined with townhouses or multi-family buildings. On one corner is a mixed-use building.
Continuous sidewalks for industrial use street
ND-v2009 NPDp1:Walkable streetsposted by Noriko Nagazumi on
Hi there! The reference guide says: "Continuous sidewalks or equivalent all-weather provisions for walking are provided along both sides of 90% of streets or frontage within the project, includin
Sidewalk with landscaped area
ND-v2009 NPDp1:Walkable streetsposted by Noriko Nagazumi on
Hi, In our project, continuous sidewalks of 2.5m width are provided for all street within the project boundary, but a portion of one of the sidewalks is filled with shrabs and trees and people can
Functional Entries
ND-v2009 NPDp1:Walkable streetsposted by Omer Moltay on
Hi, The credit language is confusing for us. Some on the project team think that the credit is asking for at least one functional entry on every facade that faces a public space.