Forum quick links
Project Boundary 2 buildings on site but only 1 certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Elke Malleier on
Hi experts, I would appreciate your advice on the follwoing, please. I am unsure to draw the project boundary in situation described below: - Entire project site (including dormitory building) wil
LPB for a Residential Building Excluding the Shopping Mall
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Orçun Özhelvaci on
Dear experts, I would like to hear about your comments on the following issue: In one of our projects, a residential building is being constructed on top of a shopping mall both of which are constr
Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.
Existing MultiFamily High Rise-Exclude Occupied Commerical Space
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laura Steinbrink on
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.
College campus LEED boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jason Roberdeau on
We are working on a new residence hall which is located between two existing (non-certified) residence halls on a college campus.
Required Vegetated Area and LEED Boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by CT G on
Hello, We have a project with the following site constraints: The LEED Project Boundary includes 2 new buildings: an office tower, and a small bank building.
Two Identical Buildings
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
Hi, we want to achieve the Precertification for a CS project. There are two office buildings, almost identical, on the same parcel. They share four underground parking levels.
Site Boundary Including Other Structures
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Vicki Rybl on
We are certifying a ~30K sf building that shares its site (legal parcel) with a large 8 story garage.
LEED NC project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jatuwat Varodompun on
We purchased an abandon building which will be renovated for both envelope, Electric, and HVAC. The problem is we will own only have of the building.
existing parking garage in the LEED project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by yanghee pierce on
I am working on a project that is a part of campus. This project will be located next to a 4-story existing parking garage shared by other adjacent non-LEED certified buildings.