Parking under the building but not belonging to the same owner
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mark Frey on
Hi, We are working on a new construction of an office building located on a site where 3 other buildings will be also constructed.
LEED Project boundary and adjacent road.
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lawrence Lile on
We are building a LEED project next to an existing road. It is a gravel road owned by the same entity that owns the LEED project, and they also own the property across the road.
Parking Garage above Non LEED Building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kar Kerman on
I'm not sure whether I can (or should) include a parking garage in a project I'm working on. The parking garage is located in an adjacent building and has a separate owner.
Changes to Campus Boundary?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by David Gibney on
It was recently brought to my attention that our Master Site (under the older "block" registration process) has changed since our original design intent.
Underground LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Luis Miguel Diazgranados on
Greetings I'm working on an office project with underground parking. There is a LEED boundary which has been drawn for the street level, but the underground parking goes beyond this boundary.
Is it possible to modify a LEED boundary already registered?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mauricio J Perez R on
Dear all, We are developing the design phase of a LEED Project which is already registered in the LEED online.
construction site facilities outside of LEED project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Doreen Kruschina on
Hi, working on an industrial plant located on previous farmland the developer has leased some additional lands where he´s put the site facilities.
"Project boundaries that include other buildings"
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Renaud Gay on
Hello, MPR3 describe situation for "Project boundaries that include other buildings".
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.
site boundary questions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carrie Laurendine on
we set our site boundary per USGBC rules on this (building, portion of site regularly used by and relating to function of the building, etc).