Post a question or comment
Credit Filters
Optimize energy performance - building envelope
Filter by location
Forum
Topic
Replies
Recent

Building Envelope Commissioning

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Lance Barron  on 

We are working with a client who would like to get LEED credit for building envelope commissioning, but which has not pursued enhanced commissioning.

1
Sat Aug 26, 2017, 11:45 pm

Store targeting LEED CI certification within a mall

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Anne-Claire BARBERI  on 

Hello, We are working on LEED CI certification for a store within a mall. If the store has no external facade, does this credit can be achieved?

1
Sat Aug 26, 2017, 11:47 pm

EA Cr 1.5

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  balasubramaniam kg  on 

We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.

0

EAC1.5

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Maria Isabel Conde  on 

We have a project in a leed certified building. I want to know if the UA calculation only requires use the project areas or all the building areas. And we need to submit the product cut sheets?

1
Fri Mar 7, 2014, 3:48 pm

LEED 2009 for Retail: Commercial Interiors EAc1.5

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Robert Brown  on 

We have an existing building being renovated. The existing building envelope does not meet ASHRAE 90.1-2007 criteria.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 25, 2015, 3:02 pm