Forum quick links
Classification of multi-occupant dorm rooms
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jason Franken on
Has anyone received clear instruction or a definitive review comment that clarified how a multi-occupant dorm room should be classified for both IEQc6.1 and IEQc6.2?
Lighting controls requirements
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Marina Curto on
Hi everyone,
I'm working on a School project in v2009 and I have some doubts whether the lighting controls design would meet credit requirements. I have two different cases:
IEQc6.1 Regularly Occupied Definition and IEQc8.2 Definition
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Danielle Dunn on
I am working on a project that is pursuing both credits IEQc6.1 using Case 1 and IEQc8.2.
Template (v3) question
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Todd Bundren on
Does anyone know how to erase a line item from the tables without deleting all of the entries below?
Space Type
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saif Abdulameer on
Hello, I am working on school that has a study area, a lounge and common area as a part of a vestibule that leads to the outside or a corridor that connects classrooms.
Lighting University Store transaction area and merchandise area
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Bruce Lee on
Was not able to find this information anywhere in the threads.
EQc6.1 Documentation
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Dana Murdoch on
Does LEED have a form for inputing rooms/controllability in Version 3 like they did for Version 2.2?? Or do we just make up our own format?
2-seat Reception Area in Middle School
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sara Zoumbaris on
Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.
LEED for Schools Case 1 OR Case 2
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Dana Murdoch on
Can anyone comment on the Case 1 OR Case 2 for LEED for Schools? The letter template make allows you to use EITHER path, not BOTH as is implied in the text above in the LEED User interpretation.