Double trouble with ceilings
Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Cynthia Kaplan on
Our school project is retaining nearly all of the original plaster ceilings. We are, however, removing the suspended ceilings that were installed in the 1970's, just below the plaster ceilings.
1
Wed Nov 25, 2015, 2:40 am
Non-structural wall resurfacing
Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by James Ketter on
Our project has existing non-structural plaster walls that will be reused in place.
1
Tue Mar 29, 2011, 1:45 pm