Forum quick links
Zone Air Distribution Effectiveness
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Noriko Nagazumi on
Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue. Our project utilizes total heat exchangers for ventilation.
Occupant Density - Filling out the IEQp1 form
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Ron Dean on
Hello, I have two specific questions, please help me working them out. 1.
Recilculation Class Air
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on
Hi everybody, I am working in an office building project, core and Shell scope.
n/a
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).
Project size increase
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Silvia Ruiz on
Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1.
Operable Windows
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on
We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area.
ASHRAE Standard 62.1 - 2010
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Maya Karkour on
Hello, Does anyone know if the ventilation system/strategy of a LEED 2009 project can be designed according to ASHRAE 62.1-2010 instead of 62.1-2007? I haven't looked at the 2010, but I heard the
Minimum IAQ Requirement: Ashrae 62.1 vs. Ashrae 170
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Daniel Joseph on
We are in the midst of certifying a Medical office core and shell building. Our scope includes the landscaping, parking lot, side walks, and building shell.
ASHRAE Standard
CS-2009 IEQp1:Minimum indoor air quality performanceposted by ilkyaz ceren güçlü on
Hello, We are carrying out LEED certification of an office building.
Confidential lease agreements cannot be obtained
CS-2009 IEQp1:Minimum indoor air quality performanceposted by John Mader on
Our project is an office building with some retail spaces on its lower floors that have already been leased.