Submetering - Core & Shell 2009

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Mohammad Haj-Ali  on 

We're designing an office building that the owner wants to provide flexibility in leasing, such that tenants can rent certain spaces in the floor, whole floors, or the whole building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Sep 14, 2015, 1:06 pm

Monitoring System

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Marina Andrade  on 

Hi! In the project we have not a BMS system to monitor energy consumption but the electric company will be regularly measured.

8
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Tue Mar 24, 2015, 5:59 pm

Sample M & V plan

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Saud Abdul Rasheed  on 

Hello All, Does anyone has a sample plan or any M & V plan which he/she can share with us here?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Feb 11, 2015, 3:44 pm

Who provides for the submeters?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Michael E. Edmonds-Bauer  on 

We have a project that will not provide submetters for future tenants however the BMS system will be ready for future tenants to provide their own submetter in order to measure electricity consumpt

5
Thu Jul 24, 2014, 4:40 pm

Submetering for AHUs with multiple tanents

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Jatuwat Varodompun  on 

We have an hi-rise office building with Chiller and AHUs system. We plan to 3 AHUs per floor. 1.

5
Wed Mar 26, 2014, 1:00 pm

Plan development

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Michael E. Edmonds-Bauer  on 

For this purpose we would like to know if: - In order to comply with requirements, can we develop a plan similar to the one use for the core & base building (calibrated simulation)?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jan 9, 2014, 7:45 pm

Centrally metering network

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Ron Dean  on 

I'm working on a residential project that doesn't have a centrally monitored metering network.

5
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Mon Nov 25, 2013, 9:18 pm

Combined metering for plug loads and lighting

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Rudolph Carneiro  on 

I am having lots of trouble with design teams in getting them to seperate internal lighting circuitry from plug loads.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 24, 2013, 11:28 pm

Clarification

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Leandro Silva  on 

Please help with this scenario: Core and Shell project with 8 tenants (light manufacturing). Goal of achieving EAc5.1 and EAc5.2. The developer will meter total energy use of the Core areas and a

4
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Tue Oct 1, 2013, 1:38 pm

Tenant submetering

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Rudolph Carneiro  on 

We are confused as to what "centrally monitored" means. Does it mean that the building owner must install wiring infrastructure to monitor each tenant individually from a BMS or can the wiring be

3
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Mon Sep 23, 2013, 9:12 pm