Sub Metering of Service Hot Water (Domestic Hot Water)
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.
Tenant Submetering connected to BMS?
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Marco Abdallah on
We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.
Separating lighting metering from plug load metering.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Rudolph Carneiro on
I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.
Model Calibration - Margins for Error
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
For a new office building would it be acceptable to use these error margins for an M&V Report.
EA Credit 5.1: Base Building Sub-metering
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ian McCall on
Hello all, I am working on a large Core and Sheel project composed of office spaces and commercial centre (in France). The comercial centre is 5 stories high and occupied by one single tenant.
List energy end uses
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Mike D on
"The M and V Plan omits the table or listing of the project’s energy end uses as required by the form." However, the Plan we have submitted lists the following: Locations and types of energy meter
M&V period for LEED 2009 C&S projects for EAc5.1 + EAc5.2
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Philip Herriges on
The LEED reference guide is very particular in the language that they use to describe the intent and stragegies for EAc5.1 and 5.2 for C&S as being distinct from NC & Schools. For NC&
Description of quality assurance procedures.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Rudolph Carneiro on
I recieved a comment for a project of mine and dont really know what they want exactly.
submit to leed-online compliance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I
EA 5,1
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Muhammad Faisal Azizullah Jaffar on
We are working on a mall project going ahead with the LEED CS GOLD.We are currently on tender stage and the client has suddently come up with the LEED requirement.