Post a question or comment
Credit Filters
Water Use Reduction
Filter by location
Forum
Topic
Replies
Recent

WC's

CS-2009 WEp1:Water Use Reduction
posted by  CRolim Engenharia  on 

Hi all! I am working on a residential building with a large leisure area. One of this leisure area is the assembly room that has two WC's: men's room and ladies room.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Thu May 23, 2013, 12:38 pm

Tenant lease clauses

CS-2009 WEp1:Water Use Reduction
posted by  Mike D  on 

If our project has a water reduction of 30% but is not installing any urinals or kitchen taps, what clauses should be included for the tenant?

2
Default Avatar
LEEDuser Basic Member
45 thumbs up
Thu May 23, 2013, 1:44 am

BLOW OUT FIXTURE

CS-2009 WEp1:Water Use Reduction
posted by  OSCAR DE LA RED  on 

Do I have to use the 3.5 gpf for baseline and installed blow out fixture if installed fixture is lower than 1.6 gpf.

2
Thu Apr 25, 2013, 7:57 am

Faucet Flow Duration

CS-2009 WEp1:Water Use Reduction
posted by  Kevin Short  on 

When calculating for a low-flow fixture, it is required to enter a duration (which is default set to 30 seconds).

3
Mon Sep 24, 2012, 10:51 pm

LEED Form L-8 for WEp1 CS

CS-2009 WEp1:Water Use Reduction
posted by  charles bell  on 

Where can we find this? Thanks

4
Default Avatar
M.Sc. | Dipl.-Ing. (FH) | LEED AP BD&C
ALPHA Energy & Environment GmbH
LEEDuser Basic Member
18 thumbs up
Mon Jun 18, 2012, 11:45 am

All indoor water is outside of project owner scope

CS-2009 WEp1:Water Use Reduction
posted by  Mary Frances Stotler  on 

I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out.

3
Fri Mar 23, 2012, 4:23 pm

Defining usage groups for tenant scope fixtures.

CS-2009 WEp1:Water Use Reduction
posted by  Luis Miguel Diazgranados  on 

Hi everyone, I'm working on an office building in which efficient bathrooms will be installed as part of the Core and Shell scope.

2
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Wed Mar 7, 2012, 5:50 pm

Troubles filling the template

CS-2009 WEp1:Water Use Reduction
posted by  Stéphane Paris  on 

Hi, I'm working on a urban office building and have some troubles filling the template: - We will have automatic sensor for lavatories: how can I take it in consideration?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 22, 2012, 5:21 pm

Greywater and WEpr1 Template Calulations

CS-2009 WEp1:Water Use Reduction
posted by  James Keohane  on 

In completing the form for WEpr1, I noticed that there is no way to acknowledge/take advantage of our projects use of greywater. Oh sure WEcr2 allows us to take advabtage of greywater usage.

2
Tue Feb 21, 2012, 9:45 pm

Documentation for demonstrating the sanitary fixtures flow rate

CS-2009 WEp1:Water Use Reduction
posted by  Caroline Ma  on 

Regarding the documentation to demonstrate the sanitary fixtures flow rate, can we submit a test report conducted on-site which can demonstrate the exact flow rate of the sanitary fixtures in our p

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 20, 2012, 5:39 pm