Forum quick links
WC's
CS-2009 WEp1:Water Use Reductionposted by CRolim Engenharia on
Hi all! I am working on a residential building with a large leisure area. One of this leisure area is the assembly room that has two WC's: men's room and ladies room.
Tenant lease clauses
CS-2009 WEp1:Water Use Reductionposted by Mike D on
If our project has a water reduction of 30% but is not installing any urinals or kitchen taps, what clauses should be included for the tenant?
BLOW OUT FIXTURE
CS-2009 WEp1:Water Use Reductionposted by OSCAR DE LA RED on
Do I have to use the 3.5 gpf for baseline and installed blow out fixture if installed fixture is lower than 1.6 gpf.
Faucet Flow Duration
CS-2009 WEp1:Water Use Reductionposted by Kevin Short on
When calculating for a low-flow fixture, it is required to enter a duration (which is default set to 30 seconds).
LEED Form L-8 for WEp1 CS
CS-2009 WEp1:Water Use Reductionposted by charles bell on
Where can we find this? Thanks
All indoor water is outside of project owner scope
CS-2009 WEp1:Water Use Reductionposted by Mary Frances Stotler on
I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out.
Defining usage groups for tenant scope fixtures.
CS-2009 WEp1:Water Use Reductionposted by Luis Miguel Diazgranados on
Hi everyone, I'm working on an office building in which efficient bathrooms will be installed as part of the Core and Shell scope.
Troubles filling the template
CS-2009 WEp1:Water Use Reductionposted by Stéphane Paris on
Hi, I'm working on a urban office building and have some troubles filling the template: - We will have automatic sensor for lavatories: how can I take it in consideration?
Greywater and WEpr1 Template Calulations
CS-2009 WEp1:Water Use Reductionposted by James Keohane on
In completing the form for WEpr1, I noticed that there is no way to acknowledge/take advantage of our projects use of greywater. Oh sure WEcr2 allows us to take advabtage of greywater usage.
Documentation for demonstrating the sanitary fixtures flow rate
CS-2009 WEp1:Water Use Reductionposted by Caroline Ma on
Regarding the documentation to demonstrate the sanitary fixtures flow rate, can we submit a test report conducted on-site which can demonstrate the exact flow rate of the sanitary fixtures in our p