Forum quick links
Enhanced Cx - Submittal reviews - HVAC&R only?
NC-v4 EAc1:Enhanced commissioningposted by André Harms on
In reference to the V4 LEED Reference Guide for Building Design and Construction, Enhanced Commissioning section: In the Step-by-Step guidance, “Step 4.
ASHREA 0-2005
NC-v4 EAc1:Enhanced commissioningposted by Amrit Kaur on
Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?
Energy Star eligibility for very large Display Monitors
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Harry Flamm on
Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h
Basement Levels in ASHRAE 90.1 Energy Models
CS-2009 EAp2:Minimum energy performanceposted by Ciaran McCabe on
Hi, I am modelling a 6 storey office building which also has a basement car park.
Occupants / users of public park
NC-2009 WEp1:Water use reductionposted by Deborah Lucking on
Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?
Operable Windows & Mechanical Ventilation
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Charalampos Giannikopoulos on
Would an operable window be an eligible type of thermal comfort control in a mechanically ventilated building or would such a control require that the building is naturally ventilated?
Combine options
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Leandro Silva on
We are certifying a Project and we are preparing the documentation for the EQ credit 3.2 Construction Indoor Air Quality Management Plan – Before Occupancy.
Corrective Actions and Sub-metering
CS-2009 EAc5.2:Measurement and verification - tenant submeteringposted by Jatuwat Varodompun on
For the submetering, we can just provide the box that allow the tenant to install the meter, right?
Existing building reconstruction and expansion
NC-2009 EAp2:Minimum energy performanceposted by Deborah Lucking on
Questions for the experts: We have a project that will have some floor areas demolished and reconstructed/renovated, and also some new construction (less than 20%). 1.
Functional, usable spaces
NC-2009 SSc7.2:Heat island effect - roofposted by Jeannie Rueter on
What is the definition of "functional, usable spaces"?