Forum quick links
Multiple AHUs for one space
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Patrick Cellie on
I'm currently dealing with a convention center that has large ballrooms and meeting rooms served by multiple AHUs.
Possible Exemption?
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Alexis Thompson on
Our project building has 5 AHU systems; 4 of them significantly exceed ASHRAE (200%, 130%, 363%, 41%). The building is a laboratory and has very stringent requirements for OA delivery and IAQ.
Natural ventilation
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by American University on
Most all of our buildings have a combo of mechanical ventilation (e.g. in hallways) and natural ventilation (e.g. in residence hall rooms).
population diversity factor
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Katherine Ann Resurreccion on
Our project is an office building with 300 regular occupants. One zone/occupancy category of the building is a multi-purpose room.
Going for IEQc1.3 after complying with EQp1 (v4)
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Rasita Masalskyte on
The office building is being certified under EBOM v2009. The project team wants to substitute the prerequisite IEQp1 v2009 with EQp1 v4 and then achieve IEQc1.3 credit.