Off-site PV farm financed by property owner
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Dricka Brown Thobois on
I am working with a property who is going for LEED EBOM recertification. The property is owned by a large business that has financed, owns, and maintains, a very large PV farm on the wes
On - Site Solar Panels with in house Manually recorded sub metering
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Robert Fernandez on
Hello,
On-Site vs. Off-Site
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Kimberlee Dobbins on
We are working with out Utility Provider and they will be putting solar panels on the roof of our building.
Calculating the required REC's
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Robin Obaugh on
This is related to Re-certification. We purchased 24 months of RECs during our initial certification. We have not determined when our next performance period will end, now or in the 5th year.
Purchasing RECS after the Performance Period
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Summer Gorder on
Based on our reviewer clarifications, we are needing to take a different tactic to meet our goal.
How can the PV array benefit be shared?
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Maria Vasapollo on
Our campus has multiple buildings, one of which is going for EBOM now. The PV array is adjacent (in the parking lot). The PV's do have a meter, so we know their output.
RECs for Europe
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Charalampos Giannikopoulos on
Could you advise of a list of REC vendors who could provide offsite renewable energy for a project located in Europe (Greece)?
On Site Renewable
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Joseph Snider on
The project would like to consider this credit. For that a PV system was previously installed and has been in operation within the performance period.