Forum quick links
Lighting Zone definition according to MLO for ASHRAE compliance
NC-2009 SSc8:Light Pollution Reductionposted by LEED Pro Consultant on
We are developing a high rise multi-residential project (5 buildings) in a undeveloped land, the area is between the access to a national park and multiple neighborhood (residential units).
Project Boundary School Campus Project
NC-2009 SSc8:Light Pollution Reductionposted by david naughton on
I have a project in which all of the project boundaries border campus property except for one which borders a county road. Do I only need to be concerned with light trespass on the boundary t
Lighting power of roof garden.
NC-2009 SSc8:Light Pollution Reductionposted by James Chueh on
Hi, Our project has a roof garden and we are calculating the LPD for building exteriors. If there are some luminaires in the roof garden, how do we define the LPD for roof garden?
Exterior Lighitng: Facade Lighting
NC-2009 SSc8:Light Pollution Reductionposted by Saud Abdul Rasheed on
Hello All, My question may be simple but still I want to be clear about it.
Interior Ligting - definition of the direct line of sigth
NC-2009 SSc8:Light Pollution Reductionposted by Anna Korinkova on
We are working on a building including offices and a warehouse. For the warehouse, there is a night time operation assumed.
Facade lighting - off after 10pm
NC-2009 SSc8:Light Pollution Reductionposted by Anna Korinkova on
Hello, Would that be possible to reach the credit, if the facade lighting doesn't fullfil the upligth criteria, but it is turned off after 10pm?
Residence Hall 24 hour Use Spaces
NC-2009 SSc8:Light Pollution Reductionposted by Lisa Ferreira on
We have designed a residence hall that has single and double rooms on a double loaded corridor, with shared floor lounges and studies.
Bollard lighting
NC-2009 SSc8:Light Pollution Reductionposted by Erin Holdenried on
It seems like most bollard lights emit light straight out to the sides at 180 or 360 deg spreads. Therefore allowing a lot of light to be emitted above 90 deg from nadir.
Hotels achieving this credit?
NC-2009 SSc8:Light Pollution Reductionposted by Nelina Loiselle on
Has any one worked on/heard of a hotel project that was able to achieve this credit?
Indoor lighting and working between 11 pm and 5 am.
NC-2009 SSc8:Light Pollution Reductionposted by Lise Dannesboe on
We are working with an office building which has requirements for providing working stations between 11 pm and 5 am.