Forum quick links
GHG Emissions in Pilot Credit EAC27
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Arda Moltay on
Pilot Credit EApc27 requires the eventual MV evaluation report to include an evaluation of: "Avoided GHG emissions compared to the EA Credit 1 baseline." We're doing a CS2009 project and we have n
EAc7 Community Contaminant Prevention - Airborne Releases
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Andrew Gil on
The Online form asks "Does the project have an engine(s) that is 1,000 bhp or greater?" and includes check boxes for both "yes" and "no" responses: Is this credit more like WEc1 wherein you get cre
Pilot Credit vs EAc5
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Sara Goenner Curlee on
I am working on a LEED NCv2.2 academic building which has completed its EAc5 Measurement and Verification effort. I am trying to understand how EAc5 and the pilot credit differ.
Clarification for credit application
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by monu goyal on
hii, We are doing LEED - CI project, I am getting what should I submit at design stage, I can submit copy of contract, google survey and a draft M&V plan.