Reconcile Designed and Actual Energy Performance
Filter by location
Forum
Topic
Replies
Recent

GHG Emissions in Pilot Credit EAC27

Pilot-Credits PC27:Reconcile Designed and Actual Energy Performance
posted by  Arda Moltay  on 

Pilot Credit EApc27 requires the eventual MV evaluation report to include an evaluation of: "Avoided GHG emissions compared to the EA Credit 1 baseline." We're doing a CS2009 project and we have n

1
Tue Nov 26, 2013, 7:38 pm

EAc7 Community Contaminant Prevention - Airborne Releases

Pilot-Credits PC27:Reconcile Designed and Actual Energy Performance
posted by  Andrew Gil  on 

The Online form asks "Does the project have an engine(s) that is 1,000 bhp or greater?" and includes check boxes for both "yes" and "no" responses: Is this credit more like WEc1 wherein you get cre

0

Pilot Credit vs EAc5

Pilot-Credits PC27:Reconcile Designed and Actual Energy Performance
posted by  Sara Goenner Curlee  on 

I am working on a LEED NCv2.2 academic building which has completed its EAc5 Measurement and Verification effort. I am trying to understand how EAc5 and the pilot credit differ.

3
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Fri Nov 1, 2013, 2:27 pm

Clarification for credit application

Pilot-Credits PC27:Reconcile Designed and Actual Energy Performance
posted by  monu goyal  on 

hii, We are doing LEED - CI project, I am getting what should I submit at design stage, I can submit copy of contract, google survey and a draft M&V plan.

3
Default Avatar
Environmental Engineer
Metadesign Architects Pvt. Ltd.
LEEDuser Basic Member
43 thumbs up
Sat Jul 2, 2011, 1:32 pm