How many sample locations for measurement?
CI-v4 EQc9:Acoustic performanceposted by Brian Salazar on
I am looking to take mic measurements of the ambient noise in our space to provide a baseline for HVAC Background Noise. The Acoustic performance Calculator specifies the following:
Use of alternative standards - UK
CI-v4 EQc9:Acoustic performanceposted by R Jones on
Hi - what other standards are allowed as an equivalent to the ASHRAE standard? is the British Council for Offices (BCO) guidance accepted for all parts ?
thanks
adjacent spaces outside scope of work?
CI-v4 EQc9:Acoustic performanceposted by Erin Holdenried on
For LEED projects that consist of tenant space within a larger building, do they have to consider adjacencies to spaces outside the scope of work?
Is it ok to have furniture installed when measuring T60 (reverberation)?
CI-v4 EQc9:Acoustic performanceposted by BEE Incorporations on
I suspect it's ok but I just want to be sure because it's not indicated in the LEED Guide. Thank you.
Bar Space
CI-v4 EQc9:Acoustic performanceposted by Kevin Gilleran on
Hi. We are working on a TI within a shell building which will have a bar, seating, lounge area, kitchen prep areas with support spaces and its own restrooms. No office function etc.
Office, conference room to Hallway, stairs STCc Interpretation
CI-v4 EQc9:Acoustic performanceposted by Jeffrey Fullerton on
In this credit, there is a requirement for an STCc 50 rating for "Office, conference room" to "Hallway, stairs".
TI scope vs. CS base building
CI-v4 EQc9:Acoustic performanceposted by Michelle Rosenberger on
How do we achieve this credit based only on TI scope of work?
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.