Rainfall data taken from AQUASTAT (annual by country), how to calculate?

CS-v4 SSc4:Rainwater management
posted by  Marine Petrosyan  on 

Hi, All!

The daily rainfall data is not available four our project in our country. We chose to check the Aquastat data, which gives only one average annual number, 562mm.

0

Question about Rainwater Tank volume

CS-v4 SSc4:Rainwater management
posted by  Konstantina Kalliakoudi  on 

Hello  LEED experts,

I have a project with a small Open space, so the LID techniques will be collection and reuse of rainwater via Rainwater cistern.

0

Rainfall Events calculator

CS-v4 SSc4:Rainwater management
posted by  Simona Kabadova  on 

The project is situated in Sofia, Bulgaria.

0

rainwater reuse on site

CS-v4 SSc4:Rainwater management
posted by  Alfonzo Farber  on 

We are working with a building in an urban core area that wants to upsize the stormwater retention tank to capture all rainwater on site.  They then plan to use the water for irrigation, cooli

0

Time limit for rainwater reuse

CS-v4 SSc4:Rainwater management
posted by  Norbert Szircsak  on 

Dear All,

I was trying to find a guidance about it everywhere but didn't find or missed it.

My question is regarding is there any time limit to reuse the collected rainwater?

0

MDE's simple equation for estimating surface area

CS-v4 SSc4:Rainwater management
posted by  Erkki Seinre  on 

I came across a video about treatment area calculation on USGBC website: 

0

Is there a stormwater management sample document/template for LEED v4?

CS-v4 SSc4:Rainwater management
posted by  Qidi Jiang  on 

I noticed that the sample document provided in the documentation toolkit is applicable to LEED v2009, and not sample document for LEED v4 is available. 

0

Harvesting storm water on a zero-lot-line project and discharging in a nearby canal

CS-v4 SSc4:Rainwater management
posted by  Costanza Della Torre  on 

Dear all,

I am not quite sure the approach we're using in a zero lot line project is correct to achieve this credit and would like to have your opinion.

1