Sprayed concrete as a temporary stabilization measure
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Michael E. Edmonds-Bauer on
Our project has around 10 levels of undergrouns parking. A huge ramp for earth-movement vehicles is being created as construction evolves.
Guidelines/Sample of a good ESC plan proposal
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Ann E on
Storm Water Pollution Plan for Construction Management
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Anna Korinkova on
How should we implement the ESC/Storm Water Pollution Plan in case that the client does not have one GC but various suppliers for various construction phases.
SSp1 description for CS precertification
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Nándor Kovács on
We are working on a project precertification (v2009) and I was suprised that the precertification credit form requires a description of measures that will be implemented at the project site. Can so
Water filtration
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on
How much filtration is required when discharging rainwater that contains suspended solids? We have some rainwater acumulation and we would like to know if a simple screening will be enough.
NYC project
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Megan Bove on
Hi. I have a project in the city where subway grates are found right outside the project fence as well as always a storm drain that is on a very busy street.
Exposed slopes
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on
If the construction site is really "active", that is to say there is earth movement everyday and the slopes are changing every couple of days, do we need to protect them everysingle day? According
2012 EPA CGP comply with this prerequisite?
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Pamela Svetllana Santos Souza on
I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA CGP can be used instead of 2003 EPA CGP to comply with this prerequisite?