We have a govt. project that is building on a greenbuild site. The pre-development condition of the site is an LZ1. However, after the project is developed, there will be over 1m sq. feet of multiple buildings on the site, and some of the buildings will be 24/7 operation. After development, we believe the project will probably be an LZ2.

The question we have is the lighting zone classification based on the pre-developed condition of the site, or the post-developed condition of the site?