Hello!
We have a project in which the client will install a roofing material with an SRI value of 70 (low slope: requirement-78) for 100% of the roof area.
Can this be compliant with this credit, using the weighted calculation? Even though 100% of the roof has an SRI value lower than 78?
Thanks!!!