Hello,
A Warehouse project failed LEED BD + C certification in 2011 and wants to try again in 2018 with the same Building and for minimum cost.
What are options available ?
Is it possible to add minor changes and still apply for LEED BD+C ?
Or are the only options LEED O+M and LEED ID+C ?
Thank you
Paula Melton
Editorial DirectorBuildingGreen, Inc.
LEEDuser Moderator
182 thumbs up
June 20, 2018 - 11:33 am
New construction projects need to submit within two years of occupancy, so I think LEED for Existing Buildings is your best bet at this point.